Project

Tufts Joyce Cummings Center

The Details

Project Details

Completed in 2021, Tuft’s Joyce Cummings Center in Medford, MA hosts a variety of academic departments, research labs, and study areas, while also functioning as a prime venue for external events. Its proximity to the Tufts/Medford MBTA Green Line station ensures easy access for students, local residents, and the Boston community.

The construction of the Joyce Cummings Center at Tufts University came with a unique set of challenges that tested the OBS team’s expertise and adaptability. One of the primary hurdles was navigating the long lead times for critical materials, which required meticulous planning and coordination to keep the project on schedule. Additionally, the work involved operating at significant elevations, adding another layer of complexity to the construction process. Our team’s commitment to safety, precision, and effective communication ensured that we successfully overcame these challenges, delivering a state-of-the-art facility that meets the university’s high standards for both functionality and design.

It’s the details that count

N

Zintra Felt Baffles and Wall Panels

N

Topakustic Wood Panels & Ceilings

Tufts Joyce Cummings Center, Medford, MA

Tufts Joyce Cummings Center

Zintra baffles by MDC Interior Solutions

Zintra baffles by MDC Interior Solutions

TopAkustics Type 28/4m

TopAkustics Type 28/4m

Dacoustics Claro

Dacoustics Claro

Certainteed 1344

Certainteed 1344

Work With Us

We love a challenging project!

Call Us Today

(603) 424-2686